Plan-do-check-act (PDCA) cycle


#|A|B|C|D|E|F|G|H|I|J|K|L|M|N|O|P|Q|R|S|T|U|V|W|X|Y|Z Index  


Plan-do-check-act (PDCA) cycle - short version

(1) A four-step process for quality improvement. In the first step (plan), a way to effect improvement is developed. In the second step (do), the plan is carried out, preferably on a small scale. In the third step (check), a study takes place between what was predicted and what was observed in the previous step. In the last step (act), action is taken on the causal system to effect the desired change. The plan-do-check-act cycle is sometimes referred to as the Shewhart cycle, because Walter A. Shewhart discussed the concept in his book Statistical Method From the Viewpoint of Quality Control, and as the Deming cycle, because W. Edwards Deming introduced the concept in Japan. The Japanese subsequently called it the Deming cycle. Also called the plan-do-study-act (PDSA) cycle.

(2) PDCA - A cycle for process improvement pioneered by w. E. Deming. aka Plan-Do-Study-Act (PDSA).

 



 



Chartitnow

IQ Catch Banner

Advertising





Definition in Russian| Definition in French| Definition in Japanese| Definition in Vietnamese| Definition in Greek| Definition in Polish| Definition in Turkish| Definition in Portuguese| Definition in Hindi| Definition in Swedish| Definition in Arabic| Definition in Chinese| Definition in Dutch| Definition in Hebrew| Definition in German| Definition in Korean| Definition in Italian| Definition in Spanish| Definition in Thai|